Sprint 12 committed-vs-delivered

Delivery deviation · innovation-group · po-df70d341

completed
[po-deviation running] Pipeline started — https://github.com/N-iX-GenAI-Value-LAB/observability-server/actions/runs/30352686012
[po-deviation running] Phase baseline: fetching committed scope from KAN-140 and its children
[po-deviation running] Phase diff: matching committed (KAN-140) against live Jira status; jira_search unavailable so full sprint scope could not be retrieved
[po-deviation running] Phase rank: KAN-140 classified late/not-delivered (Medium priority); ranking deviation zones
[po-deviation completed] Deviation report posted: 1 amber zone (KAN-140 late/not-delivered). Scope limited — jira_search unavailable; full sprint audit requires direct Jira access.

Summary

Sprint 12 deviation analysis for innovation-group (KAN project). Reference baseline: KAN-140 — the single committed item resolved from the Jira reference. KAN-140 ("Filter client invoice history by status", Medium priority) remains in To Do status and was not delivered. Full Sprint 12 scope could not be retrieved — jira_search permission was unavailable, so other sprint items may exist outside this report. One amber deviation zone identified.

Sprint 12 deviation analysis for innovation-group (KAN project). Reference baseline: KAN-140 — the single committed item resolved from the Jira reference. KAN-140 ("Filter client invoice history by status", Medium priority) remains in To Do status and was not delivered. Full Sprint 12 scope could not be retrieved — jira_search permission was unavailable, so other sprint items may exist outside this report. One amber deviation zone identified.

Findings

0 red1 amber0 green
amber
KAN-140 was committed for Sprint 12 but its Jira status remains To Do — no work has started. If the sprint is already closed this escalates to dropped.
amber
jira_search and jira_get_agile_boards were not available. Only KAN-140 (the explicit reference) could be fetched. Other Sprint 12 items — committed or delivered out-of-scope — could not be reviewed. PO should verify full sprint scope directly.